N4 records the following events during rail process. Each event is recorded as per the use case mentioned in the Event Description column.
You can view each recorded event in the respective Business Entity Inspector view
History, Events tab.
Event Name |
Event Description |
Business Entity |
---|---|---|
ALARM_TRAIN_DELAYED_EVENT_TYPE |
When a train visit is delayed because of pending WI's. Requires a groovy job setup. See Setup alert when train visits are delayed. |
Rail Visit |
CAS_RV_REQUEST_CONTAINER_LIST |
When CAS requests for on-board container list or crane work lists for a train visit. |
Rail Visit |
CAS_RV_REQUEST_GEOMETRY |
When N4 uses the Carrier Geometry request to send the rail geometry to CAS. |
Rail Visit |
CAS_TRAIN_VISIT_UPDATE |
When a response is sent to CAS on update of train visit. |
Rail Visit |
EQ_RECEIVE_RO |
Recorded as a receive event for equipment received through a gate against the rail order. |
Rail Order |
EQ_UPDATE_RO |
When any of the order items, such as seq Nbr, Equipment Type, Quantity, ISO Group, Temperature, Ventilation, CO2, O2, etc., for a equipment rail order is updated. |
Rail Order |
NOTICE_RO |
When a general notice is generated for the Rail Order. |
Rail Order |
NOTICE_RV |
When a general notice is triggered and sent for the train visit. |
Rail Visit |
PHASE_RV |
When you advance a train visit. |
Rail Visit |
RAILCAR_DAMAGED |
When rail car visit is marked as damaged. |
Railcar Visit |
RAILCAR_INVENTORY |
When rail car position is changed. |
Railcar Visit |
RAILCAR_REPAIRED |
When rail car visit is marked as repaired. |
Railcar Visit |
RAILCAR_SPOTTED |
Confirms when a Railcar Visit has been successfully spotted by either Transfer Point, Meter Mark, GPS, or ECS. After spotting, the spotting status is visible in the History, Events tab of the Railcar Visit Inspector. In addition, if the com.navis.rail.business.entity package is included at the INFO (or above) level in the Logging tab in N4, specific logging information (such as "Railcar RCAR XXX has been spotted") is available in the navis-apex.log file. |
Railcar Visit |
RAILCAR_SPOTTING_FAILED |
When spotting fails for any of the following reasons:
|
Railcar Visit |
RAILCARVISIT_RCAR_PLF_MISSING_CENTROID |
Recorded as a service event when a rail move is excluded. |
Unit |
RCAR_PLF_MISSING_CENTROID |
When Rail Load move or Rail Disch move or any moves are excluded because the railcar platform is missing centroids. |
CHE |
REROUTE_RAIL_ORDER |
When there are routing changes in the rail order. |
Rail Order |
REROUTE_RV |
Whenever the train visit is rerouted to "Next Facility". |
Rail Visit |
RGC_SCHEDULER_REBALANCE |
When a successful RGC Scheduler re-balance is completed. |
Rail Visit |
TZ_DECKER_FAIL_TO_DECK |
When the TZ Decker failed to find a transfer point for the container to be exchanged from the AGV to the ASC (or vice versa), to the rack, or to the rail transfer TP. |
Unit |
TZ_DECKER_FAIL_TO_DECK_TBDU |
Recorded as service event when the TZ Decker failed to deck TBDU for the given work instructions. |
TBD Unit |
UNIT_ACCESSORY_DERAMP |
When the accessory unit is discharged from a railcar. |
Unit |
UNIT_ACCESSORY_IN_RAIL |
When the accessory unit arrives by train. |
Unit |
UNIT_ACCESSORY_OUT_RAIL |
When the accessory unit departs the facility by train. |
Unit |
UNIT_ACCESSORY_RAMP |
When the accessory unit is loaded to a railcar. |
Unit |
UNIT_DERAMP |
When the unit is discharged from a railcar. |
Unit |
UNIT_DISABLE_RAIL |
When the Stop-Rail field in the Units view is True and you add a hold or a permission for a unit that prevents you from performing the rail operations such as RAMP, or DERAMP. |
Unit |
UNIT_ENABLE_RAIL |
When the Stop-Rail field in the Units view is False and a unit no longer has required permissions or active holds that prevent you from performing the rail operations such as RAMP, or DERAMP. The intended outbound carrier visit of the unit must be ‘train’. |
Unit |
UNIT_IN_RAIL |
When the unit arrives by train. |
Unit |
UNIT_OUT_RAIL |
When the unit departs the facility by train. |
Unit |
UNIT_PAYLOAD_DERAMP |
When the payload unit is discharged from a railcar. |
Unit |
UNIT_PAYLOAD_IN_RAIL |
When the payload unit arrives by train. |
Unit |
UNIT_PAYLOAD_OUT_RAIL |
When the payload unit departs the facility by train. |
Unit |
UNIT_PAYLOAD_RAMP |
When the payload unit is loaded to a railcar. |
Unit |
UNIT_RAMP |
When the unit is loaded to a railcar. |
Unit |
UPDATE_RV |
When a new train visit is added or an existing train visit is updated. |
Rail Visit |